Conservancy development at Merti, Sericho, Chari Start Date: 2017 End Date: 2019 Budget Allocated: 10,000,000 Budget Used: N/A
Construction of ECDE classrooms countywide Start Date: 2017 End Date: 2018 Budget Allocated: 20,000,000 Budget Used: N/A
Sericho Water Supply Start Date: 2017 End Date: 2018 Budget Allocated: 2,500,000 Budget Used: N/A
Kiutene-Murera- Kinna –Garbatulla Road Start Date: 2018 End Date: 2022 Budget Allocated: 4B Budget Used: N/A
Training of society members, registration of SACCO‟s, auditing books of accounts for SACCO‟S Start Date: 2018 End Date: 2019 Budget Allocated: 28,500,000 Budget Used: N/A
Construction of storage tank, Installation of turbine, Main line piping system and farmers training. Start Date: 2018 End Date: 2022 Budget Allocated: 350,000,000 Budget Used: N/A
Change from diesel to solar power, redesign the intake structure, expand acreage by 200ha and farmers training. Start Date: 2018 End Date: 2022 Budget Allocated: 50,000,000 Budget Used: N.A
Construction of a Dam, expansion of irrigation infrastructure and farmers training. Start Date: 2018 End Date: 2022 Budget Allocated: 500,000,000 Budget Used: N/A
Installation drip irrigation systems and green houses, drilling of boreholes driven on solar systemand farmers training. Start Date: 2018 End Date: 2022 Budget Allocated: 20,000,000 Budget Used: N/A
-Designating and surveying the lands. -Erecting perimeter fence, constructing paddocks, feeding and watering troughs and crushes. -Borehole drilling, piping and construction of offices and stores. Start Date: 2018 End Date: 2022 Budget Allocated:…